{"id":7223,"date":"2026-11-19T00:00:40","date_gmt":"2026-11-18T16:00:40","guid":{"rendered":"https:\/\/www.moonepc.com\/?p=7223"},"modified":"2026-11-20T14:13:08","modified_gmt":"2026-11-20T06:13:08","slug":"absorption-chiller-water-piping-before-commissioning","status":"publish","type":"post","link":"https:\/\/www.moonepc.com\/fr\/news\/absorption-chiller-water-piping-before-commissioning\/","title":{"rendered":"Absorption Chiller Water Piping Before Commissioning"},"content":{"rendered":"
The water pipes of an absorption chiller<\/u><\/a>\u00a0<\/strong>carry water between separate circuits and the heat exchangers in the machine.<\/p>\n The pipe connections are generally flanged with a gasket between the two flange faces.<\/p>\n Take care when tightening flange bolts not to strain the pipework or the machine connection branch. The pipework and its fittings must be well supported and aligned so that they do not impose any strain on the machine connections.<\/p>\n The flange jointing material must be suitable for the type of water used (fresh water\/glycol) and the water temperature employed.<\/p>\n It must be adequately supported and be able to accommodate thermal expansion and contraction.<\/p>\n To prevent the buildup of scale and other deposits, and to prevent corrosion, pipework should be internally clean and free from swarf or other debris before it is connected to the machine. Where appropriate, strainers should be installed to protect the machine from debris. <\/p>\n For the unit described in the MOON-TECH product notes, cleaning and rust removal take place through a bypass before the pipes are connected to the unit. Wash water must not pass through the unit.<\/p>\n After the pipe installation has been completed, the water pipes connected to the machine must be pressure-tested. Under no account must a higher pressure be applied to the pipe connections than that specified for the absorption chiller.<\/p>\n During testing, care must be taken to eliminate water hammer. Water hammer can cause high local pressure peaks.<\/p>\n Before any pipework is finally connected, check that the pipe systems<\/u><\/a>\u00a0<\/strong>have been thoroughly cleaned and flushed.<\/p>\n Remove any rust, foreign bodies, or organic matter, to prevent possible fouling of heat exchanger tubes. Debris allowed to enter the absorber, condenser, and evaporator could lead to malfunction or mechanical damage.<\/p>\n Strainers should be installed for system cleanliness in the cooling water circuit, chilled-water circuit, and hot-water circuit.<\/p>\n The strainer screens must be cleaned at regular intervals.<\/p>\n The direction of flow through a strainer is indicated by an arrow on the casing. Correct flow direction is a basic requirement.<\/p>\n The MOON-TECH product notes place thermometers and pressure gauges near the water inlets and outlets.<\/p>\nPipe connections<\/b><\/strong><\/h2>\n
<\/p>\nTemporary bypass<\/b><\/strong><\/h2>\n
<\/p>\nStrainers<\/b><\/strong><\/h2>\n
Gauges and thermometers<\/b><\/strong><\/h2>\n
Vents and drains<\/b><\/strong><\/h2>\n