Electricity bills are rising, carbon taxes are applied per ton of emissions, and regulators are phasing out old refrigerants. You are faced with a simple choice: grow quickly or pay at a high price. The fastest path forward combines proven natural refrigerants, smarter compression phases, and zero-downtime retrofits. This is where MOON-TECH steps in. Founded in 1956, the company serves over 120 countries from nine global R&D and manufacturing bases. It holds 263 national patents, leads China’s market with 60 percent share in concrete cooling and 80 percent in oilfield gas treatment, and delivers full-lifecycle solutions from energy audit to remote monitoring.

Want to Cut Energy Bills by 25-40% in One Year?
Energy now eats the largest chunk of your operating budget. Every kilowatt saved drops straight to profit. Start with three proven moves that deliver measurable gains within months.
Adopt Natural Refrigerant Cascade Systems
Ammonia and CO₂ cascade setups reach COP values above 5.5 at minus 40°C evaporation. Over 560 installations worldwide prove annual savings of 800,000 tons of CO₂ equivalent.
Upgrade to Compound Two-Stage Technology
The Open-Type Compound Two-Stage Screw Refrigeration Compressor Unit handles wide temperature ranges with one machine. It cuts power use by 30 percent versus single-stage units at low loads.

Choose Skid-Mounted Quick Retrofit Solutions
Factory-assembled skids arrive pre-tested. Bolt them in, connect pipes, and restart production in weeks instead of months.
Still Using R22 or R404A in 2026?
Regulations ban these refrigerants outright next year. Stockpiles vanish, prices soar, and fines loom. Switch now or face forced shutdowns.
Face Legal Risks and Cost Explosion
Refrigerant costs already tripled in some regions. Non-compliance penalties add thousands daily.
Achieve Payback Within 24 Months
Natural refrigerant conversions recover investment through lower energy and zero purchase costs for banned gases.
Get One-Stop Migration Support
Expert teams handle refrigerant swap, pipe flushing, and control upgrades in a single coordinated project.
Why Do Most Optimization Projects Fail?
Too many efforts replace one component and stop. True savings demand system thinking. Avoid these common traps.
Focus Only on Compressor Replacement
New compressors in old piping lose 15 percent efficiency from pressure drops and poor heat transfer.
Ignore Heat Recovery Opportunities
Waste heat from condensers can preheat process water or drive absorption chillers, cutting fuel bills.
Miss Predictive Maintenance Tools
Remote sensors spot bearing wear early. Fix issues before failures cost unplanned downtime.
Which Technology Delivers Highest COP in 2026?
Electricity will be the single largest operating cost in industrial refrigeration by 2026. Choosing the wrong compression technology can add hundreds of thousands of dollars to your yearly bill. Here are the only three configurations that consistently lead the efficiency rankings today and will dominate tomorrow.
Compound Two-Stage Design Leadership
This is the undisputed champion for temperatures below minus 35 °C. A single machine combines intermediate cooling and economizer injection to reach COP values up to 6.8 at minus 40 °C evaporation and minus 10 °C condensation. Real installations in large frozen-food plants show 28-35 % lower power consumption than traditional two-machine booster systems.
| Evaporation Temperature | Typical COP (Compound Two-Stage) | Energy Saving vs Old Booster |
| –40 °C | 6.4 – 6.8 | 30 – 38 % |
| –50 °C | 5.1 – 5.6 | 35 – 45 % |
Economizer-Enhanced Single-Stage Efficiency
When evaporation stays above minus 15 °C (common in chilled water, fruit storage, and chemical process cooling), the Open-Type Single-Stage Screw Refrigeration Compressor Unit with built-in economizer delivers the best return. The sub-cooling effect adds 18-22 % cooling capacity and lifts COP by 0.6-0.9 points with almost no extra power.

Separate Two-Stage Fast Deployment
Perfect for plants with large daily temperature swings or frequent partial loads. Two dedicated motors and cylinders give independent capacity control from 10 % to 100 %. Result: average yearly COP stays 15-20 % higher than fixed compound machines under real variable conditions.
How to Complete Retrofit Under 30 Days?
Downtime kills margins. Plan every step to keep product flowing while new equipment installs.
Factory Pre-assembled Skid Design
The Open-type Skid-Mounted Separate Two-Stage Screw Compressor Unit ships ready to run. Only utility connections remain on site.

Digital Twin Zero On-site Conflict
3D models catch clashes before steel arrives. Crews work from exact plans.
Global 24/7 Spare Parts Network
Local warehouses stock critical components. Flights deliver anything else overnight.
Ready for Carbon-Neutral Cold Chain by 2026?
Customers and regulators demand net-zero proof. Build it into your system from day one.
Combine Cascade with Waste Heat Recovery
Pair ammonia/CO₂ chilling with absorption heat pumps. Turn condenser heat into useful steam.
Add Ice Slurry Peak Shaving
Store cold overnight at off-peak rates. Discharge during expensive daytime hours.
Join Verified Carbon Reduction Program
Annual audits certify every ton avoided. Use the data for tax credits and marketing.
You control the timeline. Electricity rates wait for no one. Systems installed today run cleaner and cheaper tomorrow. Over 1,000 automated warehouses and countless process plants already prove the numbers work. Contact MOON-TECH and lead your sector into 2026.
FAQ (Pertanyaan umum)
Q1: How much production downtime should I realistically budget for when swapping to a new compressor units?
A: With parallel skid installation, most food and chemical plants experience zero to three days of partial capacity reduction, and no complete shutdown. The new skid runs alongside the old system during commissioning. Once stable, you switch over in hours. Full cutover rarely exceeds one weekend.
Q2: My customers and investors keep asking for verified carbon-reduction figures. How do I prove the savings are real?
A: Every project includes sub-metering of electricity, gas, and water. Independent third-party engineers perform annual ISO 50001-style verification and issue stamped reports. These documents qualify you for carbon credits, green loans and customer ESG scorecards.
Q3: My plant floor space is extremely tight. Will the new high-efficiency units even fit in the existing machine room?
A: Modern skid-mounted compound and two-stage units are 20-35 % more compact than 15-year-old equivalents at the same capacity. Many plants gain valuable floor space after retrofit, because the new layout eliminates old buffer tanks and separate oil coolers.